Roll Shutters - Installation
# ROLLerUP Roll Shutters Installation Overview...
# ROLLerUP Roll Shutters Installation Overview
Installing roll shutters can significantly enhance the security, privacy, and energy efficiency of your home or business. This article provides an overview of the pre-installation requirements, installation process, what to expect on installation day, and post-installation care for your ROLLerUP roll shutters. Professional installation is required to ensure optimal performance and safety.
## 1. Pre-Installation Requirements
Before your installation team arrives, there are several essential preparations:
### Measurements
- **Window and Door Dimensions:** Accurate measurements of the windows and doors where the roll shutters will be installed are crucial. Measure the width and height, and ensure to account for any obstructions, such as molding or handles.
- **Depth of Installation:** Determine the depth of the recess where the shutters will be fitted, as this will influence the type of shutter and installation method chosen.
### Site Preparation
- **Accessibility:** Clear the installation area of furniture and other obstructions to allow the installation team easy access to windows and doors.
- **Power Source:** If you have chosen electric roll shutters, ensure there is a nearby power source for the installation team to connect the motor.
- **Inspection of Surrounding Areas:** Check for any potential issues, such as damaged window frames or walls, which may need to be addressed prior to installation.
### Materials
- **Shutter Type:** Choose between electric or manual shutters, as well as the material (aluminum, steel, or timber) that best suits your performance needs and aesthetic preferences. ROLLerUP custom-makes all shutters to order.
## 2. Installation Process Overview
The installation of ROLLerUP roll shutters typically follows these steps:
### Steps
1. **Arrival and Assessment:** The installation team will arrive at the scheduled time and assess the installation site based on the provided measurements.
2. **Preparation of the Area:** The team will prepare the area, ensuring it is ready for the installation of the shutters.
3. **Mounting the Shutter Box:** For both electric and manual shutters, the shutter box will be securely mounted above the window or door frame.
4. **Installation of the Shutter Slats:** The horizontal slats will be assembled and fitted within the box, ensuring smooth operation.
5. **Connection of Electrical Components:** If electric shutters are selected, the motor will be connected to the power source, and the necessary wiring will be completed.
6. **Testing Functionality:** The team will test the operation of the shutters to ensure everything functions correctly, addressing any concerns as they arise.
7. **Final Adjustments:** Any final adjustments will be made to ensure the shutters operate smoothly and fit securely.
### Timeline
- **Duration:** The installation process can take anywhere from a few hours to a full day, depending on the type and size of the shutters being installed. Generally, smaller installations are quicker, while larger, more complex projects may require additional time.
## 3. What to Expect on Installation Day
On the day of installation, here is what you can expect:
- **Professional Team:** A trained and experienced installation team will arrive at your location to carry out the installation. They will arrive with all the necessary tools and equipment.
- **Initial Consultation:** The team will conduct a brief consultation to discuss the installation process and address any last-minute questions or concerns.
- **Minimal Disruption:** While some noise and activity are inevitable, the installation team will work efficiently to minimize disruption to your daily routine.
- **Quality Check:** After installation, the team will conduct a thorough quality check, ensuring that the shutters operate smoothly and meet your expectations.
## 4. Post-Installation Care
After the installation of your roll shutters, proper care and maintenance will ensure their longevity and optimal performance:
- **Regular Cleaning:** Clean the shutter slats periodically with a mild detergent and water to remove dust and debris. Avoid abrasive cleaners that could scratch the surface.
- **Lubrication of Moving Parts:** For manual shutters, lubricate the moving parts periodically to ensure smooth operation. Follow manufacturer guidelines for specific recommendations.
- **Inspection:** Regularly inspect the shutters for any signs of wear or damage. Address any issues promptly to avoid more significant repairs in the future.
- **Professional Servicing:** Schedule professional maintenance checks at least once a year to ensure that the shutters remain in good working order.
By following this installation overview, you will be well-prepared for the installation of your ROLLerUP roll shutters, ensuring a seamless process that enhances your property’s security and comfort. For any further questions or to schedule your installation, please contact ROLLerUP at 1-855-576-5587.